Used 2024 BMW X5 M Competition

View All Images Close
Get E-Price
Call Us
Used 2024 BMW X5 M Competition
Pricing Details
Price: $98,888

Trade-In Appraisal
Check Availability


Vehicle Saved!

Used 2024 BMW X5 M Competition


Vehicle Details
  • Stock #: U06996
  • VIN: 5YM13ET04R9U06996
  • Mileage: 15326
  • Engine: 4.4L V8 DOHC 32V TwinPower Turbo
  • Exterior Color: Black Sapphire Metallic
  • Interior Color: Black
  • Transmission: 8-Speed Automatic Sport

Dealer Comments

Earth MotorCars is Proud to offer this amazing: 2024 BMW X5 M Competition Executive Package Carbon Fiber Trim CARFAX One-Owner. Clean CARFAX. 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Auto-leveling suspension, Automatic temperature control, Brake assist, Bumpers: body-color, Compass, Connected Package Pro, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Executive Package, Exterior Parking Camera Rear, Four wheel independent suspension, Front & Rear Heated Seats, Front Bucket Seats, Front Massaging Seats, Front Ventilated Seats, Gesture Control, Heated & Cooled Cupholders, Heated Front Seats, Illuminated entry, Knee airbag, Live Cockpit Pro, Panic alarm, Panoramic Sky Lounge LED Roof, Radio data system, Rain sensing wipers, Rear Manual Side Window Shades, Rear window defroster, Rear window wiper, Remote keyless entry, Soft-Close Automatic Doors, Speed control, Spoiler, Steering wheel mounted audio controls, Tachometer, Wheels: 21'' x 10.5'' Fr & 22'' x 11.5'' Rr Bi-Color.

We are not affiliated with the Manufacturer other than Lotus so we recommend that you contact your local franchise dealer to confirm options and warranty information. Please ask your sales representative for details. Welcome to Dallas Fort Worth's Premier Lotus, Luxury, Exotic and Classic Cars Dealership. We specialize in offering the Finest Vehicles, Providing Outstanding Customer Service, Obtaining the Best Financing Options and Stocking a Large Selection of Luxury Vehicles, Exotics, Classic Cars and More! See for Yourself what Thousands of Customers have Discovered over the Years and Make your Next Purchase from Earth MotorCars! Our Goal is to Make you a Customer for Life! Learn more about us by calling 214-483-9040 or via e-mail at sales@earthmotorcars.com. Visit us on our Website at www.earthmotorcars.com.


Test Drive
Get Pre-Approved
Request More Info

Similar Vehicles

Installed Options
  • Navigation System
  • Connected Package Pro
  • Executive Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • AM/FM Stereo
  • Apple CarPlay Compatibility
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Radio data system
  • SiriusXM w/360L & 1 Yr Platinum Plan Subscription
  • Air Conditioning
  • Automatic temperature control
  • Rear air conditioning
  • Rear dual zone A/C
  • Rear window defroster
  • Tri-Zone A/C
  • Heads-Up Display
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel memory
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Auto-leveling suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Black Brake Calipers
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • Occupant sensing airbag
  • Overhead airbag
  • Panoramic Sky Lounge LED Roof
  • Power moonroof
  • Soft-Close Automatic Doors
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto tilt-away steering wheel
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • Compass
  • ConnectedDrive Services
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Gesture Control
  • Heated & Cooled Cupholders
  • Heated steering wheel
  • Illuminated entry
  • Leather steering wheel
  • Live Cockpit Pro
  • Outside temperature display
  • Overhead console
  • Passenger vanity mirror
  • Personal eSIM 5G
  • Rear reading lights
  • Rear seat center armrest
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Wireless Device Charging
  • Extended Merino Leather Seat Upholstery
  • Front & Rear Heated Seats
  • Front Bucket Seats
  • Front Center Armrest
  • Front Massaging Seats
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • Multi-Function Seats w/Lumbar Support
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 21'' x 10.5'' Fr & 22'' x 11.5'' Rr Bi-Color
  • Rear Manual Side Window Shades
  • Rain sensing wipers
  • Rear window wiper
  • Speed-Sensitive Wipers
  • Variably intermittent wipers
  • 3.154 Axle Ratio

Disclaimer

Disclaimer: We will make our best efforts that posted prices are always accurate however, we are not responsible for any typographical or other errors that may appear on the site. If the posted price for a vehicle or service is incorrect due to a typographical or other error, such as data transmission, etc., this Dealership or Pixel Motion, Inc. are only responsible for the correct price, which will be provided as soon as we are made aware of such error(s). Ultimately, it is your responsibility to ensure that the information is 100% accurate with the Dealer. Posted vehicle images and descriptions on our website is representative to what is provided by our suppliers. Please note that the actual vehicle may slightly differ from its specifications and/or images. The Dealership is not responsible for any typographical, pricing, product specifications, advertising or shipping errors. Advertised prices and availability are subject to change without notice. In the event a vehicle is posted at an incorrect price due to these errors, or if an error in pricing was received from our suppliers, the Dealership reserves the right to refuse and/or cancel these orders.

Used 2024 BMW X5 M Competition

Lotus of Dallas, conveniently located in Carrollton, TX, is your premier destination for brand-new 2024 Lotus Vehicles and an impressive selection of Pre-Owned luxury cars. Whether you are looking for the latest 2024 Lotus vehicles or a high-quality pre-owned luxury car, Lotus of Dallas has something to satisfy every automotive enthusiast.

New Lotus Vehicles For Sale 

Prepare to be captivated by the cutting-edge lineup of New Lotus Vehicles available at Lotus of Dallas. Each model embodies the brand’s unwavering commitment to performance and innovation, from the sleek and aerodynamic Lotus Emira to the groundbreaking all-electric Lotus Evija. Don’t miss the opportunity to Pre-Order the highly anticipated Lotus Eletre, a stunning SUV that seamlessly blends sportiness with practicality. For those seeking a true track-ready experience, the Lotus Emira GT4 is a race-inspired masterpiece, while the Lotus Emeya promises to redefine the boundaries of design and engineering.

Used Lotus Vehicles for Sale

In addition to our impressive selection of new Lotus vehicles, Lotus of Dallas boasts an extensive pre-owned inventory. Our pre-owned vehicles include the most reliable used Lotus vehicles for sale in Texas. Additionally, our vast used vehicle lineup has a variety of luxury brands, ensuring that you will find a car that fits your needs and budget. Our pre-owned inventory includes high-end brands such as Aston Martin, BMW, Bentley, Cadillac, Chevrolet, Dodge, Ferrari, and Ford. Other vehicles available are GMC, Mercedes-Benz, Maserati, Porsche, Tesla, Toyota, Shelby, Lamborghini, Land Rover, Lincoln, and Jeep. Each pre-owned vehicle is carefully inspected and serviced to ensure it meets our performance and high-quality standards. At Lotus of Dallas, you can find used Lotus vehicles for sale alongside other luxury brands, giving you many options to choose from.

Auto Service and Finance Specials 

Maintaining your vehicle is important to ensure its performance and longevity. At Lotus of Dallas, our state-of-the-art service center has advanced tools and highly trained technicians who specialize in servicing luxury vehicles. Whether you need more extensive repairs or routine maintenance, our team can handle all your automotive needs. Additionally, we offer a comprehensive selection of parts and accessories. Furthermore, purchasing a luxury vehicle is a significant investment, and Lotus of Dallas is committed to making the process as seamless and affordable as possible. Our finance specialists will help you navigate the various financing options available, ensuring you find a plan that fits your budget. We offer competitive finance specials to help you get the best deal on your new or pre-owned vehicle.

Visit Lotus of Dallas Today 

Elevate your driving experience and explore the impressive new and used vehicle inventory at Lotus of Dallas. With a commitment to exceptional service and a passion for automotive excellence, our dealership is your gateway to the ultimate in luxury and performance. Contact us today to inquire about their current offerings or schedule a test drive.

Click to call sales

While great effort is made to ensure the accuracy of the information on this site, errors can occur. Please verify all pricing and installed equipment information with a customer service representative. This is easily done by calling us or visiting us at the dealership.

We improve our products and advertising by using Microsoft Clarity to see how you use our website. By using our site, you agree that we and Microsoft can collect and use this data. Our privacy statement has more details.